作 者:方正 刘俊岩[1,2] 刘燕 Fang Zheng;Liu Junyan;Liu Yan(School of Civil Engineering and Architecture,University of Jinan,Jinan 250022,China;Engineering Technology Research Center on Urban Underground Engineering Support and Risk Monitoring of Shandong Province,Jinan 250022,China)
机构地区:[1]济南大学土木建筑学院,济南250022 [2]山东省城市地下工程支护及风险监控工程技术研究中心,济南250022
出 处:《科技通报》2023年第5期96-101,共6页Bulletin of Science and Technology
基 金:国家自然科学基金(51979122)。
摘 要:本文依托城际铁路工程中典型区间,运用有限元数值分析软件,对下穿桩基桥梁的双线盾构隧道施工进行全过程模拟,并采用Peck模型进行合理计算与验证,综合分析周边地表和桥梁结构变形。研究表明:周边地表最大沉降值为1.934 mm,地表横向沉降曲线呈单峰V型正态分布;桥墩沉降最大值为2.123 mm,沿隧道方向水平位移最大值为0.220 mm,垂直隧道方向水平位移最大值为0.462 mm,桥梁结构变形以沉降为主;与距两隧道中轴线5 m处相比,距离15 m和30 m位置处桥墩竖向位移减小7.40%和14.52%,沿隧道方向水平位移减小15.90%和26.97%,垂直隧道方向水平位移减小6.07%和9.01%。Based on the typical interval in the intercity railway project,the finite element numerical analysis software is used to simulate the whole process of the construction of the double-line shield tunnel crossing the pile foundation bridge.The Peck model is reasonably used for calculation and verification.The deformations of surrounding surface and bridge structure are comprehensively analyzed.It is shown that the maximum subsidence value of the surrounding surface is 1.934 mm,and the lateral subsidence curve of the surface shows a V-shaped normal distribution with a single peak.The maximum settlement of the bridge piers is 2.123 mm,the maximum horizontal displacement along the tunnel direction is 0.220 mm,and the maximum horizontal displacement vertical to the tunnel direction is 0.462 mm.The deformation of bridge structure is mainly settlement.Compared with the position 5 m away from the central axis of the two tunnels,the vertical displacement of the bridge piers is reduced by 7.40%and 14.52%at positions 15 m and 30 m.Under the same conditions,the horizontal displacement along the tunnel direction reduced by 15.90%and 26.97%,and the horizontal displacement vertical to the tunnel direction reduced by 6.07%and 9.01%.
分 类 号:TU94[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.74