检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘建浩 周斌 黄振军 马乐乐 LIU Jian-hao;ZHOU Bin;HUANG Zhen-jun(North China Electric Power Research Institute Co.,Ltd.Xi'an Branch;Inner Mongolia Jingneng Shuangxin Power Generation Co.,Ltd.)
机构地区:[1]华北电力科学研究院有限责任公司西安分公司 [2]内蒙古京能双欣发电有限公司
出 处:《电站系统工程》2023年第5期27-29,32,共4页Power System Engineering
摘 要:介绍了350 MW超临界循环流化床锅炉的构造、烘炉原理、烘炉设备布置、烘炉过程控制等,并对烘炉结果进行分析。本次烘炉为该机组安装过程中的首次烘炉,烘炉结果给本机组及同类型机组检修维护、热态运行提供了重要参考依据,为今后机组安全和稳定运行奠定了基础。The structure of the 350MW supercritical circulating fluidized bed boiler,the principle of the refractory drying out,the layout of refractory drying out equipment and the process control of refractory drying out is introduced,and the results of the drying out are analyzed.This refractory drying out is the first time in the installation process of the boiler.The results of refractory drying out provide an important reference for the maintenance and thermal operation of this unit and the same type of unit,which will lay a foundation for the safe and stable operation of the unit in the future.
分 类 号:TK227[动力工程及工程热物理—动力机械及工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.148.223.53