横管式煤气初冷器快速更换换热管束的实践  被引量:1

Practice of Quick Replacement of Heat Exchange Tube Bundles in Horizontal Pipe Gas Primary Cooler

在线阅读下载全文

作  者:孙峰 SUN Feng(Energy Company of HBIS Group Zhangxuan Technology,Xuanhua 075100,China)

机构地区:[1]河钢集团张宣科技能源公司,河北宣化075100

出  处:《化工管理》2023年第30期132-134,154,共4页Chemical Engineering Management

摘  要:张宣科技能源公司针对横管式煤气初冷器管束泄漏严重,初冷器后煤气温度过高,换热效率较低的情况,对初冷器换热管束进行更换,创新换热管束的过程控制,采用冷轧式流体无缝钢管材料,利用胀接法工艺,并配有简易脚手架、卷扬机、移动穿管平台,仅用30天时间就完成了初冷器内6471根换热管束的更换,既节省时间又保证工程进度与质量。In view of the serious leakage of the tube bundle of the cross-tube gas primary cooler,the high temperature of the gas after the primary cooler and the low heat exchange efficiency,Energy Company of HBIS Group Zhangxuan Technology replaces the heat exchange tube bundle of the primary cooler,the process control of heat exchange tube bundle is innovated,which adopts coldrolled fluid seamless steel tube material,uses expansion joint process,and is equipped with simple scaffolding,hoisting machine and moving pipe-piercing platform,it only takes 30 days to replace 6471 heat exchange tube bundles in the primary cooler,which can save time and ensure the project progress and quality.

关 键 词:初冷器 换管 胀管 变形 

分 类 号:TQ05[化学工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象