作 者:李岩[1] Li Yan
机构地区:[1]胜利石油管理局有限公司新能源开发中心,山东东营257000
出 处:《上海电气技术》2023年第3期46-50,67,共6页Journal of Shanghai Electric Technology
摘 要:论述了削峰填谷的目的和意义,介绍了水驱开发系统,在否决注水站加装变频器方案的基础上,提出将新能源技术应用于注水站削峰填谷。从离心泵站和柱塞泵站两方面分析了新能源技术在注水站削峰填谷中的应用,进行了理论论证,计算了经济效益和社会效益,并进行了应用总结。The purpose and significance of peak shaving and valley filling were discussed,and the water-driven development system was introduced.On the basis of rejecting the scheme of installing frequency converter in water injection station,it was proposed to apply new energy technology to peak shaving and valley filling in water injection station.The application of new energy technology in peak shaving and valley filling in water injection station was analyzed from two aspects of centrifugal pump station and plunger pump station.Theoretical demonstration was carried out,economic and social benefits were calculated,and the application was summarized.
分 类 号:TE357.6[石油与天然气工程—油气田开发工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171