检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘子杰 Liu Zijie(Beijing Uni-construction Group Co.,Ltd.,Beijing 100000,China)
出 处:《山西建筑》2023年第21期95-97,共3页Shanxi Architecture
摘 要:结合北京地铁大兴线工程土建施工01合同段义和庄站车站,对地铁车站防水施工技术进行了分析探讨,介绍了地下结构的防水标准和防水体系,以及防水施工顺序,并对施工缝、变形缝等特殊部位进行了处理,以确保防水层的防水效果,保障地铁的安全平稳运行。Combining with the civil construction contract section 01 of Beijing Metro Daxing Line project,Yihezhuang Station,this paper analyzed and discussed the waterproofing construction technology of subway station,introduced the waterproofing standards and waterproofing system of underground structure,as well as the waterproofing construction sequence,and special reinforcement measures such as construction joints and deformation joints were also taken to ensure the waterproofing effect of the waterproofing layer,ensured the safe and stable operation of the subway.
分 类 号:TU921[建筑科学—建筑设计及理论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:13.59.236.184