检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李顺波 毛龙飞 言峰 张贵峰 LI Shunbo;MAO Longfei;YAN Feng;ZHANG Guifeng(Anhui Jiangnan Chemical Co.,Ltd.,Hefei 230093,China;Xinjiang Tianhe Blasting Engineering Co.,Ltd.,Kuche 842300,China)
机构地区:[1]安徽江南化工股份有限公司,安徽合肥230093 [2]新疆天河爆破工程有限公司,新疆库车842300
出 处:《露天采矿技术》2023年第5期96-99,共4页Opencast Mining Technology
摘 要:为了解决露天煤矿深孔台阶爆破底板平整度问题,结合矿山实际,在保持台阶高度、炮孔直径以及炸药品种不变的条件下,采取通过改变底盘抵抗线大小来控制底板平整度。现场试验结果表明:在底盘抵抗线为4.5 m时,台阶底板平整度高差在±50 cm以内,台阶平整度达到了一级标准化煤矿的要求。In order to solve the problem of floor flatness of deep-hole bench blasting in open-pit coal mines,combined with the actual situation of the mine,the floor flatness is controlled by changing the size of the chassis resistance line under the condition that the bench height,blast hole diameter and explosive type remain unchanged.The field test results show that when the chassis resistance line is 4.5 m,the height difference of bench floor flatness is within±50 cm,and the bench flatness meets the requirements of Class I standardized coal mine.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.170