检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:周文聪[1] Zhou Wencong(Guangzhou Environmental Protection Science Research Institute Co.,Ltd.,Guangzhou 510620,China)
机构地区:[1]广州市环境保护科学研究院有限公司,广东广州510620
出 处:《皮革制作与环保科技》2023年第18期126-128,共3页Leather Manufacture and Environmental Technology
摘 要:近年来,输变电工程项目的环境影响评价工作日益得到重视,公众对输变电工程项目建设的关注度较高,给环评审批工作带来一定压力^([1])。本文提出在环评审批时应重点关注工程概况、环境保护目标、环境影响预测等9个方面,以进一步提高环评文件的编制质量。In recent years,the environmental impact assessment of power transmission and transformation projects has received increasing attention,and the public has paid high attention to the construction of power transmission and transformation projects,which has brought certain pressure to the environmental impact assessment approval[1].This article proposes to focus on 9 aspects during the approval of environmental impact assessment,including project overview,environmental protection objectives,and environmental impact prediction,in order to further improve the quality of the preparation of environmental impact assessment documents.
分 类 号:TS5[轻工技术与工程—皮革化学与工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.62