检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:袁卫锁 李建军 YUAN Wei-suo;LI Jian-jun(Zhengzhou Communications Planning Survey&Design Institute,Zhengzhou 450006,China)
机构地区:[1]郑州市交通规划勘察设计研究院,郑州450006
出 处:《工程建设与设计》2023年第19期73-75,共3页Construction & Design for Engineering
摘 要:剖析了桥头跳车的发生机理,总结了桥头引道设计中存在的问题,从桥头原地基处理方案、处理长度、路堤防护、台背回填、桥头搭板长度及厚度参数的选取、搭板头接茬处详细设计等方面进行设计总结,探讨了桥头跳车量化判断的目标值,从桥头变化值和容许最大台阶高度,提出量化桥头跳车判别指标,拟作为桥头引道设计的容许纵坡和台阶高度的控制性指标,虽然建设成本略增加,但能根治桥头跳车现象。This article analyzes the mechanism of vehicle jumping at the bridge head, summarizes the problems in the design of the bridge head approach, and summarizes the design from the aspects of the original foundation treatment plan, treatment length, embankment protection,backfilling of the abutment back, selection of parameters for the length and thickness of the bridge head approach slab, and detailed design of the joint of the approach slab. It explores the target values for quantitative judgment of vehicle jumping at the bridge head, including the variation value of the bridge head and the allowable maximum step height, Propose a quantitative indicator for identifying vehicle jumping at the bridge head, which is intended to serve as a control indicator for the allowable longitudinal slope and step height in the design of the bridge head approach. Although the construction cost may slightly increase, it can eradicate the phenomenon of vehicle jumping at the bridge head.
分 类 号:U416.1[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49