检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:韩佳良 刘建林 唐胜利[1] HAN Jialiang;LIU Jianlin;TANG Shengli(School of Geology and Environment,Xi’an University of Science and Technology,Xi’an 710054,China;China Coal Technology and Engineering Group Xi’an Research Institute(Group)Co.,Ltd.,Xi’an 710077,China)
机构地区:[1]西安科技大学地质与环境学院,陕西西安710054 [2]中煤科工西安研究院(集团)有限公司,陕西西安710077
出 处:《煤矿安全》2023年第9期194-201,共8页Safety in Coal Mines
摘 要:双级双速扩孔工艺技术可以实现煤矿井下顶板高位大直径定向钻孔的一次高效扩孔,克服常规正向多级扩孔技术方法提下钻工作量大、辅助钻进时间长和钻具安全性较差等局限性。扩孔钻头是实施多动力双级双速扩孔技术的关键工具,为进一步提高双级双速扩孔的碎岩效率,对双级双速扩孔钻头的冠部剖面形状、切削齿直径和切削齿结构参数进行优化设计;在此基础上建立了双级双速扩孔钻头和对应地层三维模型、有限元模型,采用动态分析软件模拟研究3种不同钻头直径的碎岩效果;优选一级钻头ф165~ф152 mm、二级钻头ф165 mm的钻头直径配比,利用新设计的双级双速扩孔钻头进行现场试验,完成2个120 mm钻孔一次钻扩至200 mm实钻施工,累积扩孔进尺474 m,扩孔综合钻效为5.6 m/h,最高钻速可以达到7 m/h。结果表明:双级双速一级钻头能够有效减少二级钻头的碎岩难度,延长钻头寿命,满足双级双速工艺要求,大大提高顶板高位大直径综合钻进施工效率。The two-stage and two-speed reaming technology can realize one time efficient reaming for the high position and large diameter directional drilling of coal mine roof,and overcome the limitations of conventional forward multistage reaming technology and method,such as heavy drilling workload,long auxiliary drilling time and poor drilling tool safety.Reaming bit is the key tool to implement the multi-power two-stage two-speed reaming technology.In order to further improve the rock crushing efficiency of two-stage two-speed reaming,the crown profile shape,cutter diameter and cutter structural parameters of the two-stage two-speed reaming bit were optimized.On this basis,the two-stage two-speed reaming bit and the corresponding formation ^(3D) model and finite element model were established.Dynamic analysis software was used to simulate the rock crushing effect of three different bit diameters.The diameter ratio of the first bit(ϕ165-ϕ152 mm)and the second bit(ϕ165 mm)was selected.The newly designed double-stage double-speed reaming bit was used for field test,and the two 120 mm drill holes were drilled to 200 mm in one time.Cumulative reaming penetration of 474 m,reaming comprehensive drilling efficiency of 5.6 m/h,the maximum drilling rate can reach 7 m/h.The results show that the two-stage two-speed first-stage bit can effectively reduce the difficulty of rock crushing of the two-stage two-speed bit,extend the life of the bit,meet the requirements of the two-stage two-speed process,and greatly improve the integrated drilling efficiency of the top roof with large diameter.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15