时序InSAR技术的高填方移民安置点变形监测研究  被引量:1

Research on deformation monitoring of high-filled resettlement sites based on time series InSAR

在线阅读下载全文

作  者:王启贵 胡迎香 黄其欢[2] Wang Qigui;Hu Yingxiang;Huang Qihuan(Zhejiang HuaDong Mapping and Engineering Safety Technology Co.,Ltd.,Hangzhou 310004,China;School of Earth Sciences and Engineering,Hohai University,Nanjing 210024,China)

机构地区:[1]浙江华东测绘与工程安全技术有限公司,杭州310004 [2]河海大学地球科学工程学院,南京210024

出  处:《工程勘察》2023年第10期35-39,45,共6页Geotechnical Investigation & Surveying

基  金:国家自然科学基金:地基InSAR高边坡三维变形提取方法研究(41304025)。

摘  要:高填方地基广泛应用于山区工程中,可有效缓解用地紧张问题,但高填方工程存在沉降不均匀问题,严重威胁建筑设施安全。本文以云南省巧家县白鹤滩库区水利移民安置点高填方地基为研究对象,采用时序PSInSAR技术获取高填方地基边坡的形变时间序列,研究其变形规律及影响因素。通过分析可以发现,在空间上,随着填方深度的增大,形变点的形变累计量增加,二者相关系数为0.64;在时间上,边坡变形与降雨相关;南段边坡土层密实度差且透水性强,形变受雨季影响较大。High-filled foundations are widely used in mountain area construction projects,effectively alleviating the problem of land shortage.However,there is a problem of uneven settlement in high-filled engineering,which seriously threatens the safety of building facilities.This paper takes the high-filled foundation of the water conservancy resettlement site in the Baihetan Reservoir Area of Qiaojia County,Yunnan Province as the research object,uses the time series PSInSAR technology to obtain the deformation time series of the high-fill foundation slope,and studies its deformation models and influencing factors.In space,with the increase of the filling depth,the cumulative amount of deformation of the deformation point increases,and the correlation coefficient between the two is O.64.In time,the deformation increment is related to rainfall.The soil layer of the southern slope has poor compactness and strong water permeability,so the deformation is greatly affected by the rainy season.

关 键 词:PSINSAR 沉降监测 移民安置点 高填方边坡 

分 类 号:P237[天文地球—摄影测量与遥感]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象