布尔台煤矿新盘区永久避难硐室设计实例  

Design Example of Permanent Refuge Chamber in New Panels of Burtai Coal Mine

在线阅读下载全文

作  者:刘炳 LIU Bing(CHN Energy Shendong Coal Group Design Company,Daliuta,Shaanxi 719315)

机构地区:[1]国能神东煤炭集团设计公司,陕西大柳塔719315

出  处:《能源科技》2023年第5期25-27,共3页Energy Science and Technology

摘  要:根据布尔台煤矿开拓布局,12上煤新盘区需设置永久避难硐室,结合矿井条件优选了永久避难硐室位置,布置在明安木独回风立井井底附近、两大巷煤柱之间。为营造快速救灾条件,在地面风井场地布置直通硐室内的钻孔,保证联络通信及物资输送。结合围岩条件,优化了硐室断面及支护方式,进行了硐室的生存保障系统设计和施工,完善了硐室功能,满足了安全生产需要。According to the development layout of the Buertai Coal Mine,a permanent refuge chamber is required in the new panel of the 12th coal transportation roadway.The location of the permanent refuge chamber is optimized based on the conditions of the mine,and it is arranged near the bottom of the Ming'an Mudu return air shaft and between two main roadway coal pillars.In order to create a rapid disaster relief condition,the boreholes in the ground air shaft site are arranged to ensure communication and material transportation.Based on the surrounding rock conditions,the chamber section and support method are optimized,and the survival support system design and construction of the chamber are carried out.The chamber functions are improved to meet the work safety needs.

关 键 词:永久避难硐室 支护方式 位置选择 生存保障系统 钻孔 

分 类 号:TD264.3[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象