城市轨道交通信号系统分段式改造方案  被引量:6

Phased Retrofi tting Scheme for Signaling System for Urban Rail Transit

在线阅读下载全文

作  者:李洁 辛鑫 Li Jie;Xin Xin(Beijing Subway Operation Co.,Ltd.,Beijing 100044,China)

机构地区:[1]北京市地铁运营有限公司,北京100044

出  处:《铁路通信信号工程技术》2023年第10期80-85,共6页Railway Signalling & Communication Engineering

基  金:北京市地铁运营有限公司科研项目(2022000581015001)。

摘  要:城市轨道交通部分线路的信号系统服役接近15年,信号系统改造迫在眉睫。传统的改造方案施工难度大、施工周期长、涉及设备多。提出一种分段式的改造方案,可降低成本提升效率,尽早解决既有车载设备故障率高给运营带来的影响。As the urban rail transit signaling systems of some subway lines have been in service for nearly 15 years,there is an urgent need to retrofit such signaling systems.The traditional retrofitting solution has such problems as huge construction difficulties,long construction period,large amount of involved equipment.Thanks to technical development,it is possible to reduce the retrofitting costs of signaling systems.The paper provides a phased retrofitting solution,which can not only reduce the costs and increase the efficiency,but also eliminate as soon as the negative impacts of the failure rate of existing onboard equipment on subway operation.

关 键 词:城市轨道交通 信号系统 分段式改造 自主感知 

分 类 号:U231.7[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象