检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:关科 李伟 Guan Ke;Li Wei(Shandong Provincial Water Resources Survey and Design Institute Co.,Ltd.,Ji'nan,Shandong 250013)
机构地区:[1]山东省水利勘测设计院有限公司,山东济南250013
出 处:《现代工程科技》2023年第16期22-24,共3页Modern Engineering Technology
摘 要:为消除梁济运河梁山至邓楼船闸段复航工程对南水北调东线水质保护、水资源控制等的影响,通过合理调整相关工程布局,研究通过邓楼节制闸改建、梁山县截污导流工程功能区调整、施工期及运行期补救等措施,达到有效保障复航段、南水北调东线南四湖至东平湖段输水水质安全的目标,为后续相关规划规划、建设、管理提供建议。In order to eliminate the impact of the resumption project of the Liangshan to Denglou ship lock section of the Liangji Canal on the water quality protection and water resource control of the eastern route of the South to North Water Diversion Project,by reasonably adjusting the layout of relevant projects,studying measures such as the renovation of the Denglou control gate,adjustment of the functional area of the Liangshan County sewage interception and diversion project,construction period,and operation period remediation,etc.,to effectively ensure the water quality safety of the resumption section and the Nansihu to Dongping Lake section of the eastern route of the South to North Water Diversion Project,Provide suggestions for subsequent planning,construction,and management.
分 类 号:TV213[水利工程—水文学及水资源]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.17.175.182