检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李张生 Li Zhangsheng(Safety Management Centre of Shanxi Kaijia Energy Group Co.,Ltd.,Jiexiu Shanxi 032000,China)
机构地区:[1]山西凯嘉能源集团有限公司安全管理中心,山西介休032000
出 处:《机械管理开发》2023年第10期273-275,共3页Mechanical Management and Development
摘 要:传统的巷道超前支护及端头支护工序复杂,工人劳动强度大,支护成本较高,生产效益较难提升。基于2901进风巷的具体地质及生产条件,在分析该巷道围岩变形破坏特征及支护难点的基础上,设计在2901进风巷原有支护方案的基础上,施打预应力高强锚索进行补强支护,并对支护方案及具体参数进行优化设计。经工业性试验及矿压观测,验证了支护方案的合理性,且工人劳动强度、支护成本、工作面推采速度等均得到改善。The traditional tunnel over-support and end-support process is complicated,the labour intensity of workers is high,the cost of support is high,and it is difficult to improve the production efficiency.Based on the specific geological and production conditions of 2901 wind tunnel,on the basis of analyzing the deformation and damage characteristics of the peripheral rock of the tunnel and the difficulties of support,the design of 2901 wind tunnel on the basis of the original support program,applying pre-stressing high-strength anchors for reinforcement support,and optimization of the support program and the specific parameters of the design,the industrial test and mine pressure observation,verified the reasonableness of the support program,and the worker labor intensity,support costs,working face pushing,and the cost of support is high.Afer the industrial test and mining pressure observation,the support scheme is verified to be reasonable,and the labour intensity of workers,the support cost,and the pushing speed of the working face are all improved.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.116.241.205