检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:常二广 CHANG Er-guang(POWERCHINA SINOHYDRO ENGINEERING BUREAU 14 CO.,LTD.,Kunming 650041,China)
机构地区:[1]中国水利水电第十四工程局有限公司,云南昆明650041
出 处:《云南水力发电》2023年第10期139-144,共6页Yunnan Water Power
摘 要:挂篮悬臂现浇法施工是现浇连续梁施工工艺中较为成熟的一种施工方法,通过挂篮的结构设计以及挂篮悬臂施工两方面,从挂篮构造、挂篮受力分析、挂篮安装、预压、移动、拆除等各个工艺环节进行详细介绍,提出了挂篮结构设计的重点为荷载组合,结构受力重点部位为底平台系统,而后通过对挂篮预压观测数据进行拟合,得出荷载-变形曲线回归方程,指导连续箱梁线形控制。The hanging basket cantilever cast-in-place method is a relatively mature construction method in the construction process of cast-in-place continuous beams.Through the structural design of the hanging basket and the cantilever construction of the hanging basket,this article provides a detailed introduction to various process links such as hanging basket structure,hanging basket stress analysis,hanging basket installation,preloading,movement,and demolition.It proposes that the focus of hanging basket structure design is load combination,and the key part of structural stress is the bottom platform system.Then,by fitting the pre compression observation data of the hanging basket,a regression equation of the load deformation curve was obtained to guide the linear control of the continuous box girder.
分 类 号:U448.213[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28