检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李杰钊 LI Jie-zhao(Guangdong Hydropower Planning&Design Institute Co.,Ltd.,Guangzhou 510000,China)
机构地区:[1]广东省水利电力测设计研究院有限公司,广东广州510000
出 处:《云南水力发电》2023年第10期319-325,共7页Yunnan Water Power
摘 要:盾构与近距离建筑物影响的变形预测及风险控制对于施工指导有积极意义。以京灶大桥跨越盾构隧洞为研究工程案例,安全监测京灶大桥施工期间对盾构隧洞结构的洞径收敛、应力、连接缝开合度变化情况,以掌握工程建筑物结构的动态变化信息,并结合PLAXIS数值模拟评价桥基分步施工对盾构隧道的影响,研究成果可对此类工程问题提供较好的知道参考,同时能够更精确掌握施工期工程安全情况。The deformation prediction and risk control of the influence of shield tunneling on nearby buildings have positive significance for construction guidance.Taking the Jingzao Bridge crossing the shield tunnel as a research project case,this article conducts safety monitoring of the convergence of tunnel diameter,stress,and changes in the opening and closing of connection joints of the shield tunnel structure during the construction period of the Jingzao Bridge,in order to grasp the dynamic change information of the engineering building structure.And it combines PLAXIS numerical simulation to evaluate the impact of bridge foundation step-by-step construction on shield tunneling.The research results can provide reference for such engineering problems,and can also provide a more accurate understanding of the safety situation of the construction period.
分 类 号:U445.55[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249