检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张祖航 董蔷薇 ZHANG Zu-hang;DONG Qiang-wei(Beihai Hehai Water&Power Design Institute Co.,Ltd.,Beihai 536000,China;Nanning College for Vocational Technology,Nanning 530007,China)
机构地区:[1]北海河海水利水电设计院有限责任公司,广西北海536000 [2]南宁职业技术学院,南宁530007
出 处:《广西水利水电》2023年第5期72-74,80,共4页Guangxi Water Resources & Hydropower Engineering
摘 要:大型水库泄洪建筑物的结构安全涉及整个水库安全问题,不同的工程根据条件的限制,都有其需要重点考虑的技术问题。驮英水库溢洪道工程通过理论计算及水工模型的试验,既能验证理论计算及设计的正确性,又能弥补理论计算考虑不到的许多涉及安全的设计,从而确保整个工程的安全。The structural safety of flood discharging structures of a large scale reservoir is related to the safety of the entire reservoir.Different projects all have key technical issues in need of special attention according to its limit conditions.For the design of spillway of Tuoying Reservoir,hydraulic model test was conducted which not only verified the correctness of theoretical calculations and design,but also make up for many safety-related designs that theoretical calculations may not take into account,so as to ensure the safety of whole project.
关 键 词:溢洪道 泄流曲线 泄槽 挑流鼻坎 掺气坎 驮英水库
分 类 号:TV65[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3