摘 要:探讨了以旺盛江水库除险加固工程施工导流方案设计的优化。介绍了原施工导流方案的主要内容和下游供水方式,然后结合工程实际情况,从启用下游水库和调整施工导流顺序两方面提出了优化的施工导流方案。实践表明,优化后的施工导流方案有效解决了原方案的不足。The author discussed the optimization of construction diversion design scheme for Wangshengjiang Reservoir Reinforcement Project.An introduction was made on the major contents of original construction diversion scheme and downstream water supply mode.Combined with the actual situation of the project,an optimized construction diversion scheme was proposed in respects of enabling the downstream reservoir and adjusting the sequence of construction diversion.As shown by practice,the optimized scheme is an effective solution to the shortage of the original construction diversion scheme.
关 键 词:旺盛江水库 除险加固 施工导流 优化方案 设计和施工
分 类 号:TV551.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.144.178.2