检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:梁鹏 余接任 罗晓峰 李太鹏 LIANG Peng;YU Jieren;LUO Xiaofeng;LI Taipeng(Zhuzhou CRRC Times Electric Co.,Ltd.,Zhuzhou,Hunan 412001,China;Hunan CRRC Intelligent Transport Technology Co.,Ltd.,Changsha,Hunan 410006,China;Hunan CRRC Westinghouse Rail Transit Technology Co.,Ltd.,Changsha,Hunan 410006,China)
机构地区:[1]株洲中车时代电气股份有限公司,湖南株洲412001 [2]湖南中车智行科技有限公司,湖南长沙410006 [3]湖南中车西屋轨道交通技术有限公司,湖南长沙410006
出 处:《控制与信息技术》2023年第5期14-18,共5页CONTROL AND INFORMATION TECHNOLOGY
基 金:湖南省创新平台与人才计划项目(2022TP2008)。
摘 要:针对智轨电车的传统制动控制系统集成度不高、调压精度低、网络通信性能差和可维护性不足等现状,文章提出一种新一代电空制动控制技术。在电子控制部分,其将传统的制动控制和压力调节模块合二为一,形成集成电控单元;在调压集成模块部分,其将压力调节阀、应急电磁阀、远程缓解阀等多个功能阀集成到一个模块中,简化了气路布局,优化了安装空间,集中了控制功能。该电空制动控制系统采用在轨道交通领域充分验证过的压力调节阀,联合电控单元新型调压算法,使得压力调节更稳定、精度更高且调节阀动作次数更少;同时,采用双以太网架构,较传统CAN通信,数据传输数量和效率提升了数十倍,网络通信能力和可维护性水平得到了较大提升。目前,该制动控制系统已完成地面联合测试和第三方的整车测试,并在最新的氢能源智轨电车上装车运用,综合性能优异。Considering the current issues such as low integration,imprecise pressure adjustment,poor network communication performance,and lack of maintainability in traditional braking control system of autonomous-rail rapid tram,the paper introduces a new generation of electro-pneumatic braking control technology.In the electronic control section,the traditional braking control and pressure regulation modules are combined into an integrated electronic control unit.In the pressure regulation integrated module section,multiple functional valves such as pressure regulating valve,emergency solenoid valve,and remote relief valve are integrated into one module.This simplification of the air circuit layout optimizes space use and centralizes control functions.This electro-pneumatic braking control system employs a pressure regulating valve that has been fully verified by rail transit,coupled with a new pressure regulating algorithm of the electronic control unit,making pressure regulation more stable,with higher accuracy and fewer actions.Additionally,the application of dual Ethernet architecture enhances data transmission quantity and efficiency by several times compared to traditional CAN communication,considerably improving network communication capabilities and maintainability levels.The braking control system has completed ground combined test and third-party vehicle test,and has been installed and applied in the latest hydrogen energy autonomous-rail rapid tram,demonstrating excellent overall performance.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7