太湖水库堆石坝石料场开采规划  

Exploitation Planning of Rockfill Dam Quarry of the Taihu Lake Reservoir

在线阅读下载全文

作  者:卫瑞岗 WEI Rui-gang

机构地区:[1]山西省水利建筑工程局集团有限公司,山西太原030006

出  处:《山西水利科技》2023年第3期1-4,7,共5页Shanxi Hydrotechnics

摘  要:寻乌县太湖水库是一座中型水利枢纽工程,坝型为混凝土面板堆石坝。坝体堆石料场规划的合理性直接决定大坝填筑能否按期顺利完工。对堆石料场开采规划方法作了详细的说明,并由此得出堆石坝石料场施工前期地质复查、料场开采分层分块及底高程确定对堆石坝施工工期和经济效益具有十分重要的作用。The Taihu Lake Reservoir in Xunwu County is a medium-sized water control project.The dam type is concrete face rockfill dam.The rationality of the planning of the dam rockfill yard directly determines whether the dam filling can be completed smoothly on schedule.A detailed explanation of the mining planning method for the rockfill dam quarry was provided,and it was concluded that the geological review in the early stage of the construction of the rockfill dam quarry,the layering and blocking of the quarry mining,and the determination of the bottom elevation play a very important role in the construction period and economic benefits of the rockfill dam.

关 键 词:料场复查 储量分析 开采范围规划 分层分块规划 

分 类 号:TV62[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象