检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Rahmat Adiprasetya Al Hasibi Abdul Haris
出 处:《Clean Energy》2023年第5期1125-1135,共11页清洁能源(英文)
摘 要:This article discusses the implementation of a hybrid renewable-energy system to satisfy the electricity requirements of a building.The analysis is based on optimization calculations performed using HOMER software.The components of the simulated hybrid renewable-energy system include photovoltaics,generators powered by biogas,converters and a grid.The input data utilized by the HOMER software are derived from measurements and surveys.The electric load curve is obtained through measurements at the location of the case study.Through surveys,parameters pertaining to the components of the hybrid renewable-energy system were gathered.The analysis was carried out using two sensitivity variables,namely electricity price and grid reliability.On the basis of these two sensitivity variables,optimal system configuration,net present cost,energy cost,return on investment,internal rate of return and payback period were analysed.The results of the analysis indicated that reducing subsidies,which results in higher electricity prices,provided opportuni-ties for economically competitive hybrid renewable-energy systems.With electricity prices of US$0.094/kWh,the return of investment and the internal rate of return increased to 15%and 19%,respectively,and the payback period decreased to 5.3 years.When a hybrid renewable-energy system is implemented in regions with low grid reliability,the same phenomenon occurs.
关 键 词:renewable energy sensitivity analysis photovoltaic BIOGAS electricity subsidy reliability of the grid
分 类 号:TM61[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.17.57.190