检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵丽平 邢西刚 刘希琛 何晓燕[1,2] 任明磊 ZHAO Liping;XING Xigang;LIU Xichen;HE Xiaoyan;REN Minglei(China Institute of Water Resources and Hydropower Research,Beijing 100038;Research Center on Flood and Drought Disaster Reduction of the Ministry of Water Resources,Beijing 100038;General Institute of Water Resources and Hydropower Planning and Design,Ministry of Water Resources,Beijing 100120)
机构地区:[1]中国水利水电科学研究院,北京100038 [2]水利部防洪抗旱减灾工程技术研究中心(水旱灾害防御中心),北京100038 [3]水利部水利水电规划设计总院,北京100120
出 处:《中国防汛抗旱》2023年第10期68-72,84,共6页China Flood & Drought Management
基 金:国家重点研发计划课题(2022YFC3006404);中国水科院减灾中心青年创新人才推进计划项目。
摘 要:可能最大降雨(Probable Maximum Precipitation,PMP)是评价核电厂防洪安全和排水系统设计的重要参数。在分析山东省某滨海核电厂厂址区域暴雨特性和天气成因的基础上,采用当地暴雨放大方法(水汽放大法和水汽效率放大法)和暴雨移置放大法推求出厂址24 h PMP。通过计算方案的合理性检查,对比山东省可能最大24 h点降雨量等值线图和其他核电厂工程24 h PMP成果,经综合分析确定该厂址24 h PMP为1100.0 mm,研究成果可为全国类似流域的PMP研究提供参考和借鉴。Probable maximum rainfall(PMP)is one of the important parameters for flood safety and drainage system design of nuclear power plants.Based on the analysis of rainstorm characteristics and weather cause in the coastal nuclear power plant,the 24 h PMP of the plant site was calculated by using the local rainstorm amplification method(vapor amplification method and vapor efficiency amplification method)and the displacement rainstorm amplification method.After checking the rationality of the calculation method for the analysis,the comparison of calculation results with the measured data and similar nuclear plant projects,the result has been recommended as the PMP of the project.Through the rationality check of the calculation scheme,and comparison with the possible maximum 24 h rainfall contour map of Shandong Province and the 24 h PMP results of other nuclear power plant projects,the 24 h PMP of the site was determined to be 1100 mm.The research results can provide reference for PMP research in similar watersheds in China.
关 键 词:可能最大降水(PMP) 当地暴雨放大法 水汽放大法 水汽效率放大法 暴雨移置放大法