检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李瑞楼 刘兆祥 卞涛 LI Ruilou;LIU Zhaoxiang;BIAN Tao(Bulianta Coal Mine,CHN Energy Shendong Coal Group Co.,Ltd.,Erdos 017209,China)
机构地区:[1]国能神东煤炭集团有限责任公司补连塔煤矿,内蒙古鄂尔多斯017209
出 处:《中国矿业》2023年第S02期173-175,共3页China Mining Magazine
摘 要:22105工作面位于哈拉沟煤矿井田22上煤一盘区,宽度251.8m,推进长度1920.5m,回采面积48.4万m^(2),煤厚1.6~2.4m,煤层平均厚度1.8m,倾角为1°~3°,整体呈正坡回采,局部有波状起伏。对工作面初次压力及周期来压步距进行了分析,对回采过程中遇到的问题及解决措施进行了阐述,对以后类似综采工作面的回采具有指导意义。The 22105 working face is located in the 22nd coal mining area of the Haragou Coal Mine.The width of the working face is 251.8 m,the advancing length is 1920.5 m,and the mining area is 484000 m^(2).The coal thickness is 1.6-2.4 m thick,with an average thickness of 1.8 m and an inclination angle of 1°-3°.The overall mining is on a straight slope,with local undulations.A detailed analysis is conducted on the initial pressure and periodic weighting step distance of the working face,and the problems encountered during the mining process and their solutions are elaborated in detail.It has guiding significance for the future mining of similar fully mechanized working faces.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.19.244.116