新建高校工程全过程管理风险识别和对策研究  被引量:2

Research on Risk Identification and Countermeasures for theWhole Process Management of Newly-built University Engineering

在线阅读下载全文

作  者:甘洋宇 GAN Yangyu(South China Normal University,Shanwei 516600,Guangdong,China)

机构地区:[1]华南师范大学,广东汕尾516600

出  处:《工程技术研究》2023年第16期135-138,共4页Engineering and Technological Research

摘  要:新建高校工程时间紧、任务重,作为地方重点项目,在建设期提高各阶段的风险管理识别能力,对节约投资、提高效率、按期交付、保障安全质量、确保流程合法合规性起着关键性作用。文章将新建高校的建设分成五个阶段:立项阶段、招投标及订立合同阶段、设计管理阶段、项目实施阶段、项目竣工验收及结算阶段,详细分析了各阶段存在的风险项及相应的风险应对策略,以期为同类项目提供指导和参考。As a key local project,the newly-built university engineering has a tight schedule and heavy tasks.Improving risk management and identification ability at each stage during the construction period plays a crucial role in saving investment,improving efficiency,delivering on schedule,ensuring safety and quality,and ensuring the legality and compliance of the process.The construction of the newly-built university is divided into five stages:project approval stage,bidding and contract signing stage,design management stage,project implementation stage,project completion acceptance and settlement stage.The risk items and corresponding risk response strategies in each stage are analyzed in detail in order to provide guidance and reference for similar projects.

关 键 词:新建高校工程 风险管理 风险识别 

分 类 号:TU71[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象