检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:范开明 曹宝英 廖永峰 FAN Kaiming;CAO Baoying;LIAO Yongfeng(Power China Guiyang Engineering Co.,Ltd.,Guiyang 550081,China)
机构地区:[1]中国电建集团贵阳勘测设计研究院有限公司,贵州贵阳550081
出 处:《中国水能及电气化》2023年第10期1-6,12,共7页China Water Power & Electrification
摘 要:光伏发电出力昼夜变幅大,为提高电能质量,减少光伏发电直接上网对电网系统的影响,文章从工程设计角度,介绍了对现有水电站进行改造方案,将光伏等新能源电源接入改造后的水电站,利用水电站原有送出通道接入电网,通过水电站良好的调节性能,实现了水光互补、优化利用的水电发展模式。The output of photovoltaic power generation varies significantly between day and night.In order to improve the quality of electric energy and reduce the impact of direct grid connection of photovoltaic power generation on the power grid system,this paper introduces the retrofitting scheme of existed hydropower stations from an engineering design perspective.It involves integrating new energy sources,such as photovoltaic power,into the modified hydropower stations.By utilizing the existed transmission channels of the hydropower station to connect to the grid,and leveraging the excellent regulation performance of the hydropower station,the water and solar power complement each other,achieving an optimized and efficient hydropower development mode.
分 类 号:TV738[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49