检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:何宇晨 杨溥[1] 冯力强 李英民[1] 常中仁[1] 牛昌林 HE Yuchen;YANG Pu;FENG Liqiang;LI Yingmin;CHANG Zhongren;NIU Changlin(School of Civil Engineering,Chongqing University,Chongqing 400045,P.R.China;Gansu Construction Investment(Holdings)Group Co.,Ltd.,Lanzhou 730050,P.R.China;Gansu Construction Investment Technology Research Co.,Ltd.,Lanzhou 730050,P.R.China)
机构地区:[1]重庆大学土木工程学院,重庆400045 [2]甘肃省建设投资(控股)集团有限公司,兰州730050 [3]甘肃建投科技研发有限公司,兰州730050
出 处:《重庆大学学报》2023年第10期51-60,共10页Journal of Chongqing University
基 金:重庆市自然科学基金项目(cstc2018jcyjAX0061);住房和城乡建设部研究开发项目(2018-K9-072)。
摘 要:为满足建筑工业化的迫切需求,进一步拓展钢框架-钢板墙结构和钢管混凝土柱-钢梁框架结构2种典型结构体系在高烈度区的应用,以某高烈度地区保障性住房建设项目为结构方案原型,分别对其进行多遇地震下的反应谱抗震设计,并补充了弹性动力时程分析验算,同时对比分析了罕遇地震下2种结构的弹塑性抗震性能。结果表明,钢框架-钢板墙结构体系在地震作用下的侧移模式呈弯曲型,塑性铰主要出现在钢板墙附近的梁端和柱端,而钢管混凝土柱-钢梁框架结构体系侧移模式呈剪切型,塑性铰主要出现在结构中间层的梁端。2种结构体系均能够满足预期的抗震设计要求,适用于高烈度区的多高层民用建筑。To address the pressing demands of industrialized construction and to broaden the application of two prominent structural systems,namely,the steel frame-steel plate wall structure and the steel frame structure with concrete-filled steel tube columns,in high-intensity regions,a high-intensity area affordable housing construction project was taken as a prototype.This involved seismic design based on frequent earthquake response spectra and supplemented by elastic dynamic time history analysis.At the same time,a comparative analysis of the elastic-plastic seismic performance of these two structural systems under rare earthquake scenarios was conducted.The results show that the steel frame-steel plate wall structure system exhibits a bending-type lateral deformation pattern,with plastic hinges predominantly forming at the beam and column ends near the steel plates during earthquakes.Conversely,the steel frame structure with concrete-filled steel tube columns displays a shear-type lateral deformation pattern,with plastic hinges primarily forming at the beam ends on intermediate floors.Furthermore,both structural systems meet the prescribed seismic design requirements,rendering them suitable for application in high-rise civil buildings within high-intensity areas.
关 键 词:钢框架-钢板墙结构 钢管混凝土柱-钢梁框架结构 抗震性能 动力时程分析
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.16.30.154