检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:江锦前 JIANG Jin-qian(Fuzhou Architectural Design Institute Co.Ltd.,Fuzhou 350011,China)
机构地区:[1]福州市建筑设计院有限责任公司,福州350011
出 处:《工程建设与设计》2023年第18期53-55,共3页Construction & Design for Engineering
摘 要:结合某海洋馆项目的海洋馆运行、维护及管理等各方面因素,介绍了海洋馆给排水、消防、虹吸雨水等系统的设计特点,并对各系统的技术措施进行研究。经过探讨得出结论:海洋馆体量庞大,设备、工艺复杂,相关人员必须做好给排水及消防设计,为消费者提供极致的观赏体验。Based on the operation,maintenance and management of an aquarium project,the design features of water supply and drainage,fire fighting,siphon rainwater and other systems of the aquarium are introduced,and the technical measures of each system are studied.After discussion,the conclusion is drawn:the ocean hall has a large volume,complex equipment and technology,and relevant personnel must do a good job in the design of water supply and drainage and fire protection,so as to provide consumers with the ultimate viewing experience.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.191.240.94