松散煤层安全开采煤柱留设可行性分析与应用  被引量:2

Feasibility analysis and application of safe mining of coal pillar in loose coal seam

在线阅读下载全文

作  者:边龙龙 BIAN Longlong(Shanxi Coking Coal Xishan Coal Power Mine rescue Brigade,Taiyuan 030200,China)

机构地区:[1]山西焦煤西山煤电矿山救护大队,山西太原030200

出  处:《煤矿现代化》2023年第6期17-20,共4页Coal Mine Modernization

摘  要:为了分析松散煤层安全采掘设置防砂煤柱方案的可行性,运用数值分析模拟西山煤矿3煤层综合机械化放顶煤开采条件下覆岩变形破坏特征,根据矿区经验公式和有关规程,计算垮落带高度以及防砂安全煤岩柱高度,分析结果表明:3煤层防砂安全煤岩柱的高度依次是5区43.6 m、6区43.0 m以及8区46.1 m,8采区3上煤层防砂安全煤岩柱为26.1 m,开采面留设防砂安全煤岩柱方法是安全可行的。In order to analyze the feasibility of setting sand control coal pillar scheme for safe mining of loose coal seam,the deformation and failure characteristics of overburden rock under the comprehensive mechanized top coal caving mining condition of 3 coal seams in Xishan Coal Mine were simulated by numerical analysis.The caving zone height and sand control safety coal pillar height were calculated according to the empirical formula of mining area and relevant regulations.The analysis results show that:3.The height of sand control safety coal pillar in coal seam is 43.6m in Zone 5,43.0m in zone 6 and 46.1m in zone 8.The sand control safety coal pillar in upper coal seam of mining zone 3 is 26.1m,and the method of setting sand control safety coal pillar on mining surface is safe and feasible.

关 键 词:留设防砂煤柱 可行性 覆岩变形 垮落带 

分 类 号:TD353[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象