检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王赟 WANG Yun(Powerchina Zhongnan Engineering Corporation,Changsha 410014,China)
机构地区:[1]中国电建集团中南勘测设计研究院有限公司,湖南长沙410014
出 处:《水电与新能源》2023年第10期11-14,共4页Hydropower and New Energy
摘 要:山地风电项目进场和场内道路的总体布置在整个项目策划和工程实施中显得尤为重要,直接影响工程投资、工期及运行管理。本文基于南方某山地风电场进场和场内道路选择进行了全面深入的分析研究,从工程布置、建设条件、运维环境、工程投资四个方面进行综合比选,推荐采用了最优方案,项目已于2021年7月全容量投产发电,运行良好。The overall layout of the entry and on-site roads in mountainous wind power projects is particularly important in the entire planning and implementation process of the projects.It directly affects the investment,construction duration and operation management of the projects.A comprehensive and in-depth analysis is carried out on the selection of the entry and on-site roads in a southern mountainous wind farm.From the aspects of the project layout,construction conditions,operation and maintenance environment,and project investment,a comprehensive comparison is conducted and the optimal scheme is recommended.The project was put into operation for power generation in July 2021 and operated well.
分 类 号:TM614[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49