检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王建 WANG Jian(Sichuan Datang International Ganzi Hydroelectric Co.,Ltd.,Kangding 626001,China)
机构地区:[1]四川大唐国际甘孜水电开发有限公司,四川康定626001
出 处:《水电与新能源》2023年第10期57-59,共3页Hydropower and New Energy
摘 要:鉴于水电站利用水能发电的特殊性,水轮发电机组过速甚至飞逸后可能造成顶盖把合螺栓断裂、流道泄漏、水淹厂房等严重后果,本文全面介绍了长河坝水电站通过利用纯机械液压过速保护装置,使得机组过速状态下事故配压阀动作关机的同时,筒型阀与事故配压阀联动关机,极大地提高了机组过速防止飞逸的安全性和可靠性。可供同类型水电厂提高安全生产管理和设备可靠性参考。Due to the special nature of hydropower generation,over-speed or even runaway of the hydro-turbine generator unit may cause serious consequences such as broken of the top cover bolts,leakage of the flow channel,or flooding of the plant.In Changheba Hydropower station,a pure mechanical hydraulic over-speed protection device is adopted.When the emergency pressure distribution valve acts and shuts down in case of an over-speed state,the cylinder valve and the emergency pressure distribution valve are interlocked and shut down,which greatly improves the safety and reliability of the over-speed prevention and anti-runaway measures of the unit.It provides useful reference for similar hydropower plants to improve their safe production management and equipment reliability.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.217.252.137