检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吴清波 WU Qingbo(Zhengzhou Water Conservancy Engineering Supervision Center,Zhengzhou 450007,China)
机构地区:[1]郑州市水利工程监理中心,河南郑州450007
出 处:《河南水利与南水北调》2023年第8期109-110,共2页Henan Water Resources & South-to-North Water Diversion
摘 要:为了正确履行安全监理职责,监理工程师在工程建设过程中应重视三方面关键步骤:一是建立健全监理安全控制体系;二是加强安全监理过程控制;三是重视自我建设,提高安全监理能力。参建各方落实主体安全责任,紧密配合,共同努力才能实现工程安全目标,确保工程顺利实施。In order to correctly perform the safety supervision responsibilities,the supervision engineers should pay attention to three key steps in the process of project construction.First,the supervision safety control system should be established and improved.Second,the process control of safety supervision should be strengthened.Third,self-construction should be paid attention to and the safety supervision ability should be improved.Only by implementing the main safety responsibilities,cooperating closely and working together can all parties involved in the construction achieve the project safety goals and ensure the smooth implementation of the project.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.219.191.41