检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘畅 王海龙 孙婧[2] LIU Chang;WANG Hailong;SUN Jing(School of Traffic and Transportation,Shijiazhuang Tiedao University,Shijiazhuang 050043,China;Hebei Key Laboratory of Diagnosis,Reconstruction and Anti-disaster of Civil Engineering(Hebei University of Architecture),Zhangjiakou 075132,Hebei,China)
机构地区:[1]石家庄铁道大学交通运输学院,石家庄050043 [2]河北省土木工程诊断、改造与抗灾重点实验室(河北建筑工程学院),河北张家口075132
出 处:《哈尔滨工业大学学报》2023年第11期99-106,共8页Journal of Harbin Institute of Technology
基 金:河北省重点研发计划(20373802D)。
摘 要:为探究风沙地区铁路路堑流场中的湍流-沙颗粒运动特性,针对性地优化设计防护措施的结构参数,对某铁路路堑流场进行了数值模拟分析。基于欧拉-拉格朗日框架建立了LES-DPM三维湍流流场模型,研究路堑在风沙地貌下的风沙流特性及沙颗粒运动规律,并根据其风沙运动特点设计单排挡沙墙和双排挡沙墙两种类型的风沙防护措施,同时通过对不同距离、不同排列方式的流场特征和防沙效果进行对比获取最优的风沙防护措施设计参数。研究结果表明:路堑结构因下凹结构导致堑内出现大量小尺度马蹄涡,钢轨附近多为破碎的低速涡团,湍流结构复杂;钢轨附近风速均小于3.6 m/s,移动沙粒易受逆压梯度影响及紊流作用向路堑内沉降;由于路堑流场的沙埋风险大大增加,对比发现,将高度2 m的挡沙墙布置在迎风侧距路堑20 m可获得最佳的防护效果,大部分颗粒被阻隔在挡沙墙前,越过挡沙墙的颗粒大多沉降在其后回流区内,且粒径均小于0.125 mm;同时发现,当采用前低后高的双排挡沙墙(2 m/3 m)可以进一步增加低速回流区范围并减少运动至路堑内的颗粒数量,提高防护效果。To investigate the turbulence-sand particle movement characteristics of the flow fields of a railway cutting in wind-blown sand areas and to optimize structural parameters for the protective measures,the numerical simulation analysis of the flow field with a railway cutting was carried out.Based on the Euler-Lagrange framework,the three-dimensional turbulent flow model of LES-DPM was established,and the characteristics of wind-sand flow and the movement of sand particles in the aeolian landform were studied.Two types of the protective measures were designed according to the characteristics of wind-sand movement,At the same time,the optimal design parameters of sand protection measures are obtained by comparing the flow field characteristics and sand prevention effects at different distances and different arrangements.The results show that a large number of small-scale horseshoe vortices appear in the cutting due to the concave structure,and most of the low broken velocity vortices near the rail,the turbulence structure is complex.The wind-velocity near the rail is less than 3.6 m/s,the moving particles is easily affected by the reverse pressure gradient and turbulence to settle into the cutting.The risk of sand burial is significantly increased.Therefore,it has been determined that the most effective protection can be achieved by placing a 2 m high retaining wall on the windward side at a distance of 20 m from the cutting.Most of the particles are trapped in front of the retaining wall,while those that manage to pass through settle in the backflow area behind it,with a particle size less than 0.125 mm.It has been observed that the utilization of a double-row sand retaining wall(2 m/3 m)can further expand the range of low-velocity reflux area and decrease the number of particles entering into the excavation,thereby enhancing its protective efficacy.
关 键 词:铁路工程 风沙流场 数值模拟 离散相模型 挡沙墙
分 类 号:U216.413[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.26