检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Bin Liu Jiwen Wang Ruirui Wang Yaxu Wang Guangzu Zhao
机构地区:[1]Geotechnical and Structural Engineering Research Center,Shandong University,Jinan,250061,China [2]School of Civil Engineering,Shandong University,Jinan,250061,China [3]Data Science Institution,Shandong University,Jinan,250100,China [4]School of Civil Engineering,Shandong Jianzhu University,Jinan,250101,China [5]School of Qilu Transportation,Shandong University,Jinan,250061,China [6]Zhejiang Huadong Construction Engineering Co.,Ltd.,Hangzhou,310030,China
出 处:《Journal of Rock Mechanics and Geotechnical Engineering》2023年第11期2842-2856,共15页岩石力学与岩土工程学报(英文版)
基 金:supported by the National Natural Science Foundation of China(Grant No.52021005);Outstanding Youth Foundation of Shandong Province of China(Grant No.ZR2021JQ22);Taishan Scholars Program of Shandong Province of China(Grant No.tsqn201909003)。
摘 要:The decision-making method of tunnel boring machine(TBM)operating parameters has a significant guiding significance for TBM safe and efficient construction,and it has been one of the TBM tunneling research hotspots.For this purpose,this paper introduces an intelligent decision-making method of TBM operating parameters based on multiple constraints and objective optimization.First,linear cutting tests and numerical simulations are used to investigate the physical rules between different cutting parameters(penetration,cutter spacing,etc.)and rock compressive strength.Second,a dual-driven mapping of rock parameters and TBM operating parameters based on data mining and physical rules of rock breaking is established with high accuracy by combining rock-breaking rules and deep neural networks(DNNs).The decision-making method is established by dual-driven mapping,using the effective rock-breaking capacity and the rated value of mechanical parameters as constraints and the total excavation cost as the optimization objective.The best operational parameters can be obtained by searching for the revolutions per minute and penetration that correspond to the extremum of the constrained objective function.The practicability and effectiveness of the developed decision-making model is verified in the SecondWater Source Channel of Hangzhou,China,resulting in the average penetration rate increasing by 11.3%and the total cost decreasing by 10%.
关 键 词:TBM operating Parameters Rock-machine mapping Intelligent decision-making MULTI-CONSTRAINTS Deep learning
分 类 号:U45[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222