检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张雯 Zhang Wen(Sinosteel Xi'an Machinery Co.,Ltd.,Xi'an 710201)
机构地区:[1]中钢集团西安重机有限公司,陕西西安710201
出 处:《冶金设备》2023年第5期61-64,共4页Metallurgical Equipment
摘 要:介绍了串罐无料钟炉顶设备均压放散系统的工作原理、目的及控制时序。由于高炉冶炼为带压操作,为了顺利将炉料布入高炉里面,必须进行均压放散。通过安装在均压放散系统的管道和设置在所述均压放散管道上的均压阀组和放散阀组,控制无料钟炉顶设备各个阀门的动作时序,从而保证炉料顺利进入高炉。The paper introduced the working principle、purpose and control sequence of pressure equalization and release system of the bell-less furnace top equipment in tandem tank.Because the blast furnace smelting is operation with pressure,in order to smoothly distribute the charge into the blast furnace,it is necessary to carry out the pressure equalization release.Through the pipeline installed in the pressure equalizing release system and the pressure equalizing valve group and the pressure releasing valve group arranged on the pressure equalizing release pipeline,the operation time sequence of each valve of the bell-less top equipment is controlled,so as to ensure the smooth flow of the charge into the blast furnace.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.21.125.27