海子河一号特大桥左侧滑坡整治方案研究  

STUDY ON THE LANDSLIDE CONTROL SCHEME ON THE LEFT SIDE OF HAIZI RIVER NO.1 SPECIAL BRIDGE

在线阅读下载全文

作  者:李亚光 Li Ya-guang

机构地区:[1]中铁建大桥工程局集团第三工程有限公司,沈阳110000

出  处:《建筑技术开发》2023年第11期128-130,共3页Building Technology Development

摘  要:依托盘兴铁路海子河1号特大桥6号~9号墩台基坑邻近滑坡体整治工程,结合现场工程地质及水文地质条件分析滑坡形成原因,从设计、施工等方面对滑坡加固工程进行了综合计算分析,针对滑坡1、2、3主轴不同情况,制订对应滑坡整治方案,并归纳总结滑坡整治具体施工顺序及注意事项,以期为相似工程条件下的滑坡整治提供参考与经验。Based on the Pan xing railway haizi river 1 large bridge NO.6~NO.9 pier platform foundation pit adjacent landslide renovation project,combined with the field engineering geological and hydrogeological conditions of the cause of landslide,from the aspects of the design,construction of landslide 1,2,3 spindle,the corresponding landslide control scheme,and summarizes the landslide regulation specific construction order and matters needing attention,in order to provide reference and experience for landslide improvement under the condition of similar engineering.

关 键 词:边坡工程 滑坡原因 整治技术 方案比选 

分 类 号:U418.55[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象