检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘嘉辉 Liu Jia-hui
机构地区:[1]贵州建工岩土基础工程有限公司,贵阳550081
出 处:《建筑技术开发》2023年第11期169-171,共3页Building Technology Development
摘 要:在黄土地区建造超高层建筑时,由于地质条件的限制,钻孔灌注桩成为一种常用的基础工程技术。与其他区域相比,黄土地区常采取泥浆护壁的钻孔灌注桩施工技术。钻孔灌注桩的设计需要考虑施工工艺技术以及土层的物理力学参数、承载力和变形特性,以确保建筑物稳定和安全。结合工程实例对超高层建筑下钻孔灌注桩的压缩变形及沉降进行初步分析。Drilled pile foundation has become a common foundation engineering technology in building super high-rise buildings in the loess area due to geological conditions limitation.Compared with other regions,the drilling and grouting pile construction technology with slurry wall protection is often used in loess area.The design of drilled piles needs to consider the technical process of construction and the physical and mechanical p arameters,bearing capacity,and deformation characteristics of the soil layer to ensure the stability and safety of the building.This paper combines engineering examples to conduct preliminary analysis on the compression deformation and settlement of drilled piles in the foundation of super high-rise buildings.
关 键 词:超高层建筑 大直径超长灌注桩 桩身弹性压缩 桩顶沉降量
分 类 号:TU63[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.116.230.250