检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:俞水情 YU Shuiqing(Shanghai Construction No.4(Group)Co.,Ltd.,Shanghai 201103,China)
出 处:《建筑施工》2023年第10期1959-1962,共4页Building Construction
摘 要:生产性抽水试验是基坑开挖条件验收的重要内容,悬挂止水帷幕基坑内外水力联系充沛,降水难度更高。针对上海某深大基坑对角分区开展现场降水试验,验证了止水帷幕和降水系统的工作效能。试验结果表明:基坑内外水位降深比为0.4~0.6,坑边采用自然回灌方式对坑内外水位影响有限。另外,设置远端观测井给出基坑降水对周边的承压水位影响,相关试验结果对类似工程具有参考意义。The productive pumping test is an important part of the acceptance of excavation conditions for foundation pits.The suspended waterproof curtain has abundant hydraulic connections inside and outside the foundation pit,and the dewatering difficulty is higher.An onsite dewatering test is conducted on a deep and large foundation pit in Shanghai to verify the effectiveness of the waterproof curtain and dewatering system.The test results show that the water level drop ratio inside and outside the foundation pit is 0.4-0.6,and the use of natural recharge at the pit edge has limited impact on the water level inside and outside the pit.In addition,the remote observation wells are set up to provide information on the impact of foundation pit dewatering on the surrounding confined water level.The relevant test results have reference significance for similar projects.
分 类 号:TU753[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.17.141.114