景观人工湿地处理初期污染雨水工程案例分析  被引量:2

Case Study of Landscape Constructed Wetland for Treatment of Initial Polluted Rainwater

在线阅读下载全文

作  者:何磊 吴克祥 邹伟国 HE Lei;WU Ke-xiang;ZOU Wei-guo(Shanghai Municipal Engineering Design InstituteCo.Ltd.,Shanghai 200092,China)

机构地区:[1]上海市政工程设计研究总院<集团>有限公司,上海每200092

出  处:《中国给水排水》2023年第18期77-83,共7页China Water & Wastewater

摘  要:近年来,茅洲河流域水污染治理工作得到大力推进,水环境质量逐步改善,但初期污染雨水问题严重制约其水环境质量进一步提升。深圳市光明区楼村湿地公园工程(设计规模3000m3/d)将初期污染雨水引入人工湿地进行处理,高效完成了初期污染雨水的就地收集、调蓄、处理和回用,既解决了当前的黑臭问题,又巧妙地打造了兼具污水处理功能和景观特色的海绵主题湿地公园。详细介绍了该工程截流系统、污水处理系统、海绵系统、湿地景观系统的设计方法。In recent years,the water pollution control in Maozhou River basin has been vigorously promoted,and the water environment quality has been gradually improved.However,the problem of initial polluted rainwater seriously restricts the further improvement of the water environment quality.The Loucun wetland park project in Guangming District,Shenzhen(design scale of 3000 m~3/d)introduces the initial polluted rainwater into the constructed wetland for treatment,and effectively completes the on-site collection,storage,treatment and reuse of the initial polluted rainwater,which not only solves the current black and odorous problem,but also cleverly creates a sponge theme wetland park with sewage treatment function and landscape characteristics.This paper introduced the design methods of intercepting system,wastewater treatment system,sponge system and wetland landscape system of the project in detail.

关 键 词:初期污染雨水处理 人工湿地 景观 

分 类 号:TU992[建筑科学—市政工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象