既有车站改造中接触网设计方案浅析  

Analysis of the Design Plan for the OCS in the Renovation of Existing Stations

在线阅读下载全文

作  者:钟松文 ZHONG Song-wen(China Railway Fifth Survey And Design Institute Group Co.,Ltd.)

机构地区:[1]中铁第五勘察设计院集团有限公司

出  处:《智能建筑与智慧城市》2023年第11期154-156,共3页Intelligent Building & Smart City

摘  要:徐连高速铁路东海县站位于既有陇海铁路东海县站南侧,新建进、出站天桥实现新建站房与既有站房互通。文章以既有陇海铁路东海县站改造为例,分析总结了营业线铁路车站新建站台雨棚、进出站天桥等工程引起的接触网工程改造设计方案,对后续既有车站改造中接触网设计工作具有一定的参考意义。The Donghai County Station of Xulian High Speed Railway is located on the south side of the Donghai County Station of the existing Longhai Railway,and the newly-built entrance and exit overpass will achieve the interconnection between the newly-built station building and the existing station building.Taking the reconstruction of Donghai County Station of the existing Longhai Railway as an example,this paper analyzes and summarizes the design scheme of OCS engineering reconstruction caused by the construction of new platform canopy,entrance and exit overpass and other projects of the train station on the business line,which has certain reference significance for the OCS design in the subsequent reconstruction of existing stations.

关 键 词:高铁车站 营业线 天桥 接触网 东海县站 

分 类 号:U225[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象