检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:雷川[1] 程鹏[1] 张智军 LEI Chuan;CHENG Peng;ZHANG Zhijun(Huaneng Shandong Shidao Bay Nuclear Power Co.,Ltd.,Rongcheng 264312,Shandong,China)
机构地区:[1]华能山东石岛湾核电有限公司,山东荣成264312
出 处:《南方能源建设》2023年第6期153-159,共7页Southern Energy Construction
基 金:中国华能集团科技项目“高温堆示范工程调试关键技术研究”(HNKJ15-H19)。
摘 要:[目的]为克服反应堆保护系统调试技术存在的不足,以提高反应堆保护系统调试效率和质量。[方法]设计了一套专用于高温气冷堆示范工程反应堆保护系统的自动化调试工具。该工具采用了先进的技术,能够自动化地完成反应堆保护系统的调试,可以大大提高调试效率和质量。[结果]阐述了高温气冷堆示范工程反应堆保护系统调试工具的研发与应用,介绍了调试工具的研发过程、难点及内容,以及信号输出、信号采集、数据处理、信息显示等自动调试功能的设计思路、实现方式及成果,经过高温气冷堆示范工程反应堆保护系统功能和性能验证方面的实际调试与应用。在调试过程中,该工具能够快速准确地发现和解决问题,证明了该工具的有效性和可用性。[结论]自动化调试工具可以提高反应堆保护系统调试的效率和质量,提高了反应堆保护系统的可靠性和安全性。同时,还需要继续研究和改进自动化调试工具,以适应反应堆保护系统不同的调试需求。[Introduction]This article aims to overcome the shortcomings of commissioning techniques for reactor protection systems and improve the efficiency and quality of reactor protection system commissioning.[Method]A set of automation commissioning tools was specifically designed for the reactor protection system of the HTR-PM.The tools which adopted advanced technology could automatically complete the commissioning of the reactor protection system,and could greatly improve the efficiency and quality of commissioning.[Result]This article mainly elaborates on the R&D and application of the commissioning tools for the reactor protection system of HTR-PM(High-Temperature Gas-cooled Reactor—Pebble-bed Module).It introduces the R&D process,difficulties,and contents of the commissioning tools,as well as the design ideas,implementation methods,and results of automatic commissioning functions such as signal output,signal acquisition,data processing,and information display.Through the actual commissioning and application of the reactor protection system of the HTR-PM in terms of function and performance verification,these tools are able to quickly and accurately identify and solve problems during the commissioning process,demonstrating the effectiveness and usability of the tools.[Conclusion]The results show that automatic commissioning tools can improve the efficiency and quality of reactor protection system commissioning,and enhance the reliability and safety of the reactor protection system.At the same time,further research and improvement of automatic commissioning tools are still needed to meet the different commissioning needs of the reactor protection system.
关 键 词:核电厂 高温气冷堆 反应堆保护系统 调试工具 调试效率
分 类 号:TL4[核科学技术—核技术及应用] TP36[自动化与计算机技术—计算机系统结构]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.141.43.16