检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:褚为 江齐刚 高谢良 戴也 CHU Wei;JIANG Qigang;GAO Xieliang;DAI Ye(Institute of Rock and soil Mechanics,Chinese Academy of Science,Wuhan 430071;Wuhan Zhongli Geotechnical Engineering Co.Ltd.,Wuhan 430071)
机构地区:[1]中国科学院武汉岩土力学研究所,武汉430071 [2]武汉中力岩土工程有限公司,武汉430071
出 处:《土工基础》2023年第5期730-735,共6页Soil Engineering and Foundation
摘 要:推进绿色环保理念的实践是各行各业的目标,基坑工程作为临时性工程,特别是城市中心地带,混凝土桩+混凝土支撑大量使用,占用地下空间等遗留问题复杂,更加需要朝着绿色环保节约的方向发展。等厚水泥土墙内插型钢的支护结构施工进度快,完工后型钢可回收利用,节省成本且后期无遗留不占用地下空间,是践行绿色环保节约理念的典型;该支护结构与传统混凝土桩一样与支撑、锚相结合,可形成多种组合形式的支护结构,在复杂的城市中心地带也可因地制宜采用,具有一定的推广意义。The practice of promoting the concept of green environmental protection is the goal of all walks of life.As a temporary project,the deep excavation engineering has considerable amount of waste of resources,especially in the urban center,the large use of concrete pile+concrete support beam,the occupation of the underground space and other leftover problems are complex,so it is more necessary to forge ahead in the direction of green environmental protection and conservation.The supporting structure of the uniform thickness soil-cement mixing wall with the insertion of hot-rolled steel beams has the advantages of the fast construction progress,the recyclable hot-rolled steel beams after the completion,cost saving and minimal leftover in the later stage,and no occupation of the underground space.It is a typical example of practicing the concept of green environmental protection and conservation;Like the traditional concrete pile,the supporting structure can be combined with the support and the ground anchor to form a variety of combined support structures,which can also be adopted according to local conditions in complex urban centers,and has certain popularization significance.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171