检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:行鹏 XING Peng(Yicheng Shouwang Coal Industry Co.,Ltd.of Shanxi,Yicheng 043504,Shanxi,China)
机构地区:[1]山西翼城首旺煤业有限责任公司,山西翼城043504
出 处:《能源与节能》2023年第11期219-221,224,共4页Energy and Energy Conservation
摘 要:首旺煤业2205工作面实施110工法开采时采空区漏风严重,上隅角瓦斯超限问题频发。采用COMSOL Multiphysics数值模拟软件对治理方案进行模拟研究。结果显示:增加直径300 mm的超大直径埋管可有效提高抽采效果,现场施工后上隅角瓦斯体积分数降低至0.30%以下,工作面上隅角瓦斯超限问题得到有效解决。When the 110 construction method was implemented in the 2205 face of Shouwang Coal Industry Co.,Ltd.,the goaf leakage was serious,and the gas over-limit problem in the upper corner was frequent.COMSOL Multiphysics numerical simulation software was used to simulate the control scheme.The results show that adding the super-large diameter buried pipe with a diameter of 300 mm can effectively improve the extraction effect,and the volume fraction of gas in the upper corner can be reduced to less than 0.30%after site construction,so the problem of over-limit gas in the corner of the working surface can be effectively solved.
分 类 号:TD713[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7