2205工作面110工法上隅角瓦斯超限治理实践  

Practice of 110 Construction Method in Upper Corner Gas Over-limit Control of 2205 Working Face

在线阅读下载全文

作  者:行鹏 XING Peng(Yicheng Shouwang Coal Industry Co.,Ltd.of Shanxi,Yicheng 043504,Shanxi,China)

机构地区:[1]山西翼城首旺煤业有限责任公司,山西翼城043504

出  处:《能源与节能》2023年第11期219-221,224,共4页Energy and Energy Conservation

摘  要:首旺煤业2205工作面实施110工法开采时采空区漏风严重,上隅角瓦斯超限问题频发。采用COMSOL Multiphysics数值模拟软件对治理方案进行模拟研究。结果显示:增加直径300 mm的超大直径埋管可有效提高抽采效果,现场施工后上隅角瓦斯体积分数降低至0.30%以下,工作面上隅角瓦斯超限问题得到有效解决。When the 110 construction method was implemented in the 2205 face of Shouwang Coal Industry Co.,Ltd.,the goaf leakage was serious,and the gas over-limit problem in the upper corner was frequent.COMSOL Multiphysics numerical simulation software was used to simulate the control scheme.The results show that adding the super-large diameter buried pipe with a diameter of 300 mm can effectively improve the extraction effect,and the volume fraction of gas in the upper corner can be reduced to less than 0.30%after site construction,so the problem of over-limit gas in the corner of the working surface can be effectively solved.

关 键 词:首旺煤业 110工法 瓦斯超限 

分 类 号:TD713[矿业工程—矿井通风与安全]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象