作 者:刘轩麟 杭炯杞 周子涵 李仕杰 LIU Xuanlin;HANG Jiongqi;ZHOU Zihan;LI Shijie(Casting Factory No.1,Dongfeng Forging Co.,Ltd.,Shiyan 442003,Hubei China)
机构地区:[1]东风锻造有限公司铸造一厂,湖北十堰442003
出 处:《铸造工程》2023年第6期32-35,共4页Foundry Engineering
摘 要:针对某商用车发动机缸体铸件机冷器室部位的渣气孔缺陷,运用CAE模拟技术,发现浇注系统存在铁液量不均匀、铁液未按顺序充型、头股铁液汇集无法排走、形成的密闭空间空气无法排走、温度场不均匀、机冷器面温度降低过快等问题。采取在直浇道底部增加一层底注内浇道的措施来改进浇注系统的设计,并通过CAE模拟分析和批量生产验证,有效改善了渣气孔缺陷,使机冷器的渣气孔缺陷由12%降低至了0.1%以下,取得了良好的经济效益。Aiming at the defects of slag porosity in the cooler chamber of a commercial vehicle engine cylinder casting,CAE simulation technology was used to find that there were some problems in the pouring system,such as uneven amount of molten iron at the gate,non sequential filling of molten iron,inability to discharge the first strand of molten iron,inability to discharge the air in the enclosed space formed,uneven temperature field,and rapid temperature reduction on the cooler surface.The measure of adding a layer of inner runner at the bottom of the straight runner is adopted to improve the design of the pouring system,and through CAE simulation analysis and batch production verification,the slag porosity defect is effectively improved,which is reduced from 12%to less than 0.1%,and good economic benefits are obtained.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.12.163.164