检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张来胜 张爱丽 Zhang Laisheng;ZhangAili(Shanghai Chuangli Group Co.,Ltd.,Shanghai 201706,China)
机构地区:[1]上海创力集团股份有限公司,上海每201706
出 处:《煤矿机械》2023年第11期8-10,共3页Coal Mine Machinery
摘 要:在不小于45°的急倾斜煤层开采方面,目前普遍使用的油池飞溅润滑已经远远达不到润滑要求,润滑不良容易导致轴承发热损坏,齿轮过度磨损影响寿命。为保证应用于大倾角煤层的采煤机在上山和下山采煤过程中摇臂的齿轮、轴承得到较充分润滑,通过对摇臂进行分腔设计,前、后摇臂单独设计强迫润滑系统,同时结合仿真软件分析和车间试验确定合适的加油位,确保大倾角采煤机摇臂的润滑。In the mining of steeply inclined coal seam with an angle greater than or equal to 45°,the current commonly used oil pool splash lubrication has been far from the lubrication requirements,poor lubrication is easy to lead to bearing heating damage,excessive wear of the gear affects the life.In order to ensure that the gear bearing of the rocker arm applied in the shearer with large dip angle coal seam gets sufficient lubrication in the process of mining up and down the hill,the rocker arm was designed by subcavity,and the front and rear rocker arms were designed separately to force lubrication system.At the same time,the appropriate refueling position was determined by combining the simulation software analysis and the workshop test,so as to ensure the lubrication of the rocker arm of the large dip angle shearer.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.118.32.116