检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:代典 李卓 DAI Dian;LI Zhuo(Guangzhou Xinzhu Engineering Supervision Co.,Ltd,Guangzhou 510610,China)
机构地区:[1]广州新珠工程监理有限公司,广东广州510610
出 处:《云南水力发电》2023年第11期169-173,共5页Yunnan Water Power
摘 要:随着水资源配置工程建设发展趋势,输水工程中小断面长隧洞工程越来越多,小断面隧洞施工由于受断面大小影响,操作空间受限,对于土石方开挖运输效率存在极大影响.根据不同断面尺寸及形式,制定不同的施工方案,有针对性地采取施工方法,有利于工程施工安全、质量及进度目标得以实现.With the development trend of water resource allocation engineering construction,there are more and more small cross-section long tunnel projects in water transmission engineering.The construction of small cross-section tunnels is greatly affected by the size of the cross-section and the limited operating space,which greatly affects the efficiency of earthwork excavation and transportation.Developing different construction plans based on different cross-sectional dimensions and forms,and adopting targeted construction methods,is conducive to achieving the safety,quality,and progress goals of engineering construction.
分 类 号:TV554.12[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.80