检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杜中奎 卓莎林 胥桥 刘阳 韦正鹏 DU Zhongkui;ZHUO Shalin;XU Qiao;LIU Yang;WEI Zhengpeng(Huadian Sichuan Power Generation Co.,Ltd.Baozhusi Hydropower Plant,Guangyuan 628000,China;Huadian Electric Power Research Institute Co.,Ltd.,Hangzhou 310030,China)
机构地区:[1]华电四川发电有限公司宝珠寺水力发电厂,四川广元628000 [2]华电电力科学研究院有限公司,浙江杭州310012
出 处:《云南水力发电》2023年第11期249-253,共5页Yunnan Water Power
摘 要:为评估水轮机改造前后的水力性能,借助商业CFD软件,对比分析3种特征工况改造前后转轮及过流部件压力、流线等水力特性,评估水轮机能量特性.计算结果表明,新转轮水力性能较原转轮有了明显改善,空化和叶道涡等性能都明显优于原转轮;新水轮机最优效率可达96.33%,加权平均效率较原水轮机提升超1%.To evaluate the hydraulic performance of hydraulic turbines before and after renovation,this article uses commercial CFD software to compare and analyze the hydraulic characteristics of the runner and flow passage components,such as pressure and streamline,before and after the renovation of three characteristic operating conditions,and evaluates the energy characteristics of hydraulic turbines.The calculation results show that the hydraulic performance of the new runner has been significantly improved compared to the original runner,and the performance of cavitation and blade vortex are significantly better than the original runner.The optimal efficiency of the new water turbine can reach 96.33%,with a weighted average efficiency improvement of over 1%compared to the original water turbine.
分 类 号:TK733.1[交通运输工程—轮机工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.217.218.162