检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:司徒仲雯 SITU Zhong-wen(Guangdong Architectural Design&Research Institute Co.Ltd.,Guangzhou 510010,China)
机构地区:[1]广东省建筑设计研究院有限公司,广州510010
出 处:《工程建设与设计》2023年第21期28-31,共4页Construction & Design for Engineering
摘 要:华为首家全球旗舰店作为华为的第一家直营店,对造型效果、空间布局、体验感等都有极高的要求。尽管项目的建筑体量较小,但是在设计与施工的过程中,有很多困难需要设计和施工团队协同解决。同时,本项目在设计和施工的过程引入了BIM协同,对项目的最终落成起到了重要的指导意义。Huawei's first global flagship store is Huawei's first directly operated store,with a lot of demands for shaping,space arrangement and experience.Therefore,the amount of building of the project is small,but there are many difficulties that the design and construction team need to cooperate in the process of design and construction.At the same time,the project introduced BIM collaboration in the design and construction process,and it played an important role in the final collapse of the project.
关 键 词:简约现代 极限净高控制 BIM协同设计施工 施工组织
分 类 号:TU204.2[建筑科学—建筑设计及理论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.143.7.73