作 者:吴国茂 崔靓靓 蔡平 WU Guo-mao;CUI Liang-liang;CAI Ping(Zunyi Survey and Design Institute of Water Conservancy and Hydropower Co.,Ltd.,Zunyi 563002,China)
机构地区:[1]遵义市水利水电勘测设计研究院有限责任公司,贵州遵义563002
出 处:《水电能源科学》2023年第11期148-151,共4页Water Resources and Power
摘 要:针对现有研究成果缺少详细分析镇墩稳定性、可滑移长度判别公式存在不足的问题,在现有计算公式基础上,优化设置伸缩节情况下管道轴向力公式,提出了弯管下游轴向力和不设置伸缩节情况下轴向力公式,分析了设置伸缩节与未设置伸缩节情况下管道轴向推力及各条件下镇墩砼量比较,得到在一定条件下不设置伸缩节的埋地钢管镇墩砼量最省,可为今后的研究设计工作提供参考。Currently,the researchers have not yet conducted a detailed analysis of the anchor block stability and there exist shortcomings in the discriminatory formula for the slip length.On the basis of the existing computational formulas,the axial force formula for the pipeline was optimized considering expansion joints,and the axial force formula was proposed for downstream elbow pipe without considering the expansion joints.Furthermore,by analyzing axial thrust on pipelines in the context of considering or not considering the expansion joints and comparing the concrete amount of the anchor block under all conditions,the anchor block of the buried steel pipe was found to have the minimum amount of concrete used in the context of not considering the expansion joints and under certain condition,which can provide a reference for future research and design work.
分 类 号:TV314[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7