检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:韩艳 HAN Yan
机构地区:[1]上海林同炎李国豪土建工程咨询有限公司,上海市200438
出 处:《城市道桥与防洪》2023年第11期11-14,M0004,M0005,共6页Urban Roads Bridges & Flood Control
摘 要:城市快速路跨江通道的方案决策,往往影响整个工程的总体方案和投资规模。以宁波快速路跨甬江通道为例,针对各种限制因素,在两岸交通组织、区域环境及工程造价和难度方面,深入论证了高架快速路和地下快速路两种方案,最终确定采用“高架快速路+局部设置分离式立交”的建设形式。这一方案将有效改善交通状况,提高城市交通运行效率。The scheme decision of urban expressway river-crossing channel often affects the overall scheme and investment scale of the whole project.Taking an expressway crossing Yongjiang River in Ningbo as an example,aiming at various constraints,considering the traffic organization of both sides of the river,the regional environment,and the cost and difficulty of the project,two schemes of elevated expressway and underground expressway are deeply demonstrated.Finally,the construction form of"elevated expressway+locally separated interchange"is determined for use.This scheme will effectively improve the traffic situation and enhance the efficiency of urban traffic operation.
分 类 号:U412.37[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.13