检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:邹雨亭 ZOU Yuting
机构地区:[1]广西交通设计集团有限公司,广西南宁530029
出 处:《城市道桥与防洪》2023年第11期149-153,M0014,M0015,共7页Urban Roads Bridges & Flood Control
摘 要:首先提出了大跨度悬臂拼装钢箱梁斜拉桥线形控制中主梁无应力构形及安装线形理论计算方法。其次以南宁市某双塔钢箱梁斜拉桥为工程背景,通过建立梁段在吊装工况下的局部模型及模拟施工过程的整体模型,得到了该桥各梁段的无应力构形和全桥安装线形。最后提出了考虑温度效应影响的钢箱主梁安装标高的修正公式,为今后类型项目线形控制提供参考。The theoretical calculation methods of unstressed configuration of the main girder and the installation alignment of the whole bridge in the alignment control of the long-span cantilever assembled steel box girder cable-stayed bridge are put forward.Taking a double-pylon steel box girder cable-stayed bridge in Nanning as the engineering background,the unstressed configuration of each girder and the installation alignment of the whole bridge are obtained by establishing the local model of the girder under the hoisting condition and the overall model simulating the construction process.A modified formula for the installation elevation of the steel box girder considering the temperature effect is proposed,which provides a reference for the alignment control of the similar projects in the future.
关 键 词:悬臂拼装钢箱梁斜拉桥 无应力构形 安装线形
分 类 号:U445[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.118.99.234